Seal Coating 2024 – Phase 2

Tentatively scheduled for Monday September 23rd, depending on the weather, several Borough roads will be getting seal coated (tar and chipped). This date is subject to change according to Suit-Kote’s schedule as they complete work for other neighboring municipalities.

The streets to be seal coated include:

  • Fremont St – Hinkler Park Exit to Water Street

  • Eastern Ave – North to Pearl

  • Skellie Ave – Station to Willow

  • Woodlawn Ave ext. – East of Station

  • Francis Ave ext. – East of Station

  • Rose Ave ext. – East of Station

  • Hinkler Parking Lot – Whole new parking lot and entrance/exit ramps (Double seal to soak into the new millings surface).

On Sep 23rd, NO PARKING on either side of the above mentioned roads. The crews potentially start early, as early as 5am or 6am, so please have your car moved at least by that time in the morning.

After the pavement preservation treatment is applied, vehicles can drive on the road within only a couple minutes.

WHAT IS SEAL COATING AND WHY THESE ROADS?

Watch the presentation at the link below for a full overview of our transportation system and a look at the seal coating process in particular

For a PDF of the presentation slides – CLICK HERE